ITAC Assessment: CO0280
ITAC logo
ITAC Assessment: CO0280
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Asphalt Products
NAICS
n/a
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $1
M
to 5
M
# of Employees 22
Plant Area 21,750
ft2
Annual Production 80,000
ton
Production Hrs. Annual 3,526
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,508 412,368
kWh
Other Energy $80,817 26,211
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,210 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,630

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Gas Savings Other Energy Savings
01 2.4133: Use most efficient type of electric motors $6,120 $12,600 $6,120
31,360
kWh
- -
02 2.2511: Insulate bare equipment $3,150 $1,730 - - $3,150
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,760 $1,710 $1,760
21,395
kWh
- -
04 2.2511: Insulate bare equipment $950 $1,280 - $950
-
MMBtu
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $870 $250 $870
4,396
kWh
- -
06 2.4221: Install compressor air intakes in coolest locations $360 $100 $360
1,758
kWh
- -
TOTAL RECOMMENDED $13,210 $17,670 $9,110
58,909
kWh
$950
-
MMBtu
$3,150
-
MMBtu
TOTAL IMPLEMENTED $9,630 $14,430 $6,480
33,118
kWh
- $3,150
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Other Gas Savings Other Energy Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs