Assessment Year | 2015 |
---|---|
Principal Product | Sign/Awning Manufacturing |
NAICS | 339950: Sign Manufacturing |
SIC | 3993: Signs and Advertising Specialties |
Sales Range | $10 M to 50M |
# of Employees | 149 |
Plant Area |
116,000
ft2
|
Annual Production | 2,200
pieces
|
Production Hrs. Annual | 5,362
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $71,173 | 1,847,486 |
kWh
|
$0.039 |
Electricity Demand | $101,046 | 4,334 |
kW-mo/yr
|
$23.31 |
Electricity Fees | $17,763 | - |
|
- |
Natural Gas | $35,413 | 5,783 |
MMBtu
|
$6.12 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $41,837 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,300 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 4.821: Pay bills on time to avoid late fees | $4,118 | - | - | - | $4,118 | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,197 | $8 |
$475
13,861
kWh
|
$722
-
kW-mo/yr
|
- | - | |
03 | 2.7221: Lower temperature during the winter season and vice-versa | $6,918 | $400 |
$5,684
165,804
kWh
|
- | - |
$1,234
-
MMBtu
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,009 | $70 |
$895
26,122
kWh
|
$114
-
kW-mo/yr
|
- | - | |
05 | 2.7135: Install occupancy sensors | $1,359 | $770 |
$1,359
39,634
kWh
|
- | - | - | |
06 | 2.2622: Replace existing chiller with high efficiency model | $5,511 | $4,400 |
$1,917
55,927
kWh
|
$3,594
-
kW-mo/yr
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $223 | $283 |
$88
2,577
kWh
|
$134
-
kW-mo/yr
|
- | - | |
08 | 4.812: Apply for investment incentives | $7,789 | $10,000 | - | - | $7,789 | - | |
09 | 2.7141: Lower light fixtures in high ceiling areas | $4,057 | $6,011 |
$1,608
46,922
kWh
|
$2,448
-
kW-mo/yr
|
- | - | |
10 | 2.3192: Use fossil fuel powered generator during peak demand periods | $5,682 | $15,286 |
$370
10,780
kWh
|
$6,155
-
kW-mo/yr
|
- |
$(-842.7)
-
MMBtu
|
|
11 | 2.1221: Replace obsolete burners with more efficient ones | $3,976 | $21,474 | - | - | - |
$3,976
-
MMBtu
|
|
TOTAL RECOMMENDED | $41,837 | $58,703 |
$12,397
361,628
kWh
|
$13,167
-
kW-mo/yr
|
$11,907 |
$4,367
-
MMBtu
|
||
TOTAL IMPLEMENTED | $10,300 | $21,552 |
$1,371
39,984
kWh
|
$835
-
kW-mo/yr
|
$4,118 |
$3,976
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs