ITAC Assessment: LL0128
ITAC logo
ITAC Assessment: LL0128
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Ceramic Pellets
NAICS
n/a
SIC 3299: Nonmetallic Mineral Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area 174,239
ft2
Annual Production 100,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $533,794 12,263,962
kWh
Electricity Demand $153,945 20,810
kW-mo/yr
Electricity Fees $28,799 -
Natural Gas $1,178,453 199,986
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $302,147 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $269,865

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings
01 2.1125: Convert to oxyfuel burners $235,855 $281,796 - - - $235,855
-
MMBtu
-
02 2.4133: Use most efficient type of electric motors $20,887 $93,094 $20,083
441,869
kWh
- $804 - -
03 2.3212: Optimize plant power factor $32,031 $38,570 - $30,799
-
kW-mo/yr
$1,232 - -
04 2.7134: Use photocell controls $251 $128 - $81
-
kW-mo/yr
$10 $160
-
MMBtu
-
05 2.8114: Change rate schedules or other changes in utility service $13,123 - - - - - $13,123
-
Tgal
TOTAL RECOMMENDED $302,147 $413,588 $20,083
441,869
kWh
$30,880
-
kW-mo/yr
$2,046 $236,015
-
MMBtu
$13,123
-
Tgal
TOTAL IMPLEMENTED $269,865 $374,890 $20,083
441,869
kWh
- $804 $235,855
-
MMBtu
$13,123
-
Tgal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs