ITAC Assessment: TN0383
ITAC logo
ITAC Assessment: TN0383
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product REFUSE COLLECTION BODIES
NAICS
n/a
SIC 3713: Truck and Bus Bodies
Sales Range $5
M
to 10
M
# of Employees 88
Plant Area
n/a
Annual Production 540
pieces
Production Hrs. Annual 4,335
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,071 1,072,978
kWh
Fuel Oil #2 $20,743 5,460
MMBtu
Other Energy $1,221 183
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,126 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,922

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Other Energy Savings
01 2.7261: Install timers and/or thermostats $5,046 - $594
11,430
kWh
$4,452
-
MMBtu
-
02 2.6124: Establish equipment maintenance schedule $1,484 $3,200 - $1,484
-
MMBtu
-
03 2.7243: Improve air circulation with destratification fans / other methods $1,204 $4,800 - $1,204
-
MMBtu
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $991 - $991
19,050
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $777 $270 $777
14,947
kWh
- -
06 2.4312: Improve lubrication practices $274 - $274
5,275
kWh
- -
07 2.6125: Keep equipment clean $121 $450 - - $121
-
MMBtu
08 2.7142: Utilize higher efficiency lamps and/or ballasts $229 $261 $229
4,396
kWh
- -
TOTAL RECOMMENDED $10,126 $8,981 $2,865
55,098
kWh
$7,140
-
MMBtu
$121
-
MMBtu
TOTAL IMPLEMENTED $8,922 $4,181 $2,865
55,098
kWh
$5,936
-
MMBtu
$121
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings Other Energy Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs