ITAC Assessment: OK0468
ITAC logo
ITAC Assessment: OK0468
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Bricks
NAICS
n/a
SIC 3255: Clay Refractories
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 90,000
ft2
Annual Production 73,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $341,555 6,848,476
kWh
Natural Gas $628,282 233,907
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,183 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,620

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,638 $7,000 $3,638
125,440
kWh
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,196 $8,775 $1,196
41,325
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $964 $2,998 $964
33,118
kWh
04 2.7144: Install spectral reflectors / delamp $1,016 $50 $1,016
35,170
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $290 $1,186 $290
9,965
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $61 $171 $61
2,052
kWh
07 2.7142: Utilize higher efficiency lamps and/or ballasts $18 $20 $18
586
kWh
TOTAL RECOMMENDED $7,183 $20,200 $7,183
247,656
kWh
TOTAL IMPLEMENTED $4,620 $10,018 $4,620
159,144
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs