ITAC Assessment: BD0028
ITAC logo
ITAC Assessment: BD0028
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Foil Lids and Paper labels
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 56
Plant Area 80,000
ft2
Annual Production 1,350,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $92,629 1,437,866
kWh
Natural Gas $38,178 10,131
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,236 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,733

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $295 $350 $295
4,689
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,733 $500 $1,733
26,964
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,517 $3,038 $3,517
54,513
kWh
-
04 2.1222: Install turbulators $363 $1,220 - $363
-
MMBtu
05 2.4133: Use most efficient type of electric motors $3,081 $5,860 $3,081
47,773
kWh
-
06 2.7135: Install occupancy sensors $6,247 $1,150 $6,247
97,011
kWh
-
TOTAL RECOMMENDED $15,236 $12,118 $14,873
230,950
kWh
$363
-
MMBtu
TOTAL IMPLEMENTED $1,733 $500 $1,733
26,964
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs