Assessment Year | 2025 |
---|---|
Principal Product | Other Basic Inorganic Chemical Manufacturing |
NAICS | 325180: Other Basic Inorganic Chemical Manufacturing |
SIC | 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 81 |
Plant Area |
40,000
ft2
|
Annual Production | 90,000,000
lb
|
Production Hrs. Annual | 3,120
hrs
|
Location (State) | Maryland |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $103,047 | 4,395,152 |
kWh
|
$0.023 |
Electricity Demand | $79,860 | 10,525 |
kW-mo/yr
|
$7.59 |
Electricity Fees | $3,787 | - |
|
- |
Natural Gas | $149,723 | 11,013 |
MMBtu
|
$13.60 |
TOTAL YEARLY COSTS | $336,417 | |||
RECOMMENDED SAVINGS* | $140,994 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 4.651: Install back-up equipment | $125,769 | $50,000 | - | - | - | $125,769 | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,428 | $3,300 |
$4,423
192,394
kWh
|
$2,005
-
kW-mo/yr
|
- | - | |
03 | 2.7261: Install timers and/or thermostats | $1,179 | $800 |
$1,179
51,280
kWh
|
- | - | - | |
04 | 2.7135: Install occupancy sensors | $651 | $1,275 |
$651
28,305
kWh
|
- | - | - | |
05 | 2.2442: Preheat combustion air with waste heat | $1,588 | $5,000 |
$(-300.0)
(-13,034)
kWh
|
$(-137.0)
-
kW-mo/yr
|
$2,025
-
MMBtu
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,173 | $4,403 |
$517
22,464
kWh
|
$656
-
kW-mo/yr
|
- | - | |
07 | 2.7232: Replace existing hvac unit with high efficiency model | $4,206 | $19,974 |
$3,074
133,674
kWh
|
$1,132
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $140,994 | $84,752 |
$9,544
415,083
kWh
|
$3,656
-
kW-mo/yr
|
$2,025
-
MMBtu
|
$125,769 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs