ITAC Assessment: LE0589
ITAC logo
ITAC Assessment: LE0589
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Other Basic Inorganic Chemical Manufacturing
NAICS 325180: Other Basic Inorganic Chemical Manufacturing
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 81
Plant Area 40,000
ft2
Annual Production 90,000,000
lb
Production Hrs. Annual 3,120
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $103,047 4,395,152
kWh
Electricity Demand $79,860 10,525
kW-mo/yr
Electricity Fees $3,787 -
Natural Gas $149,723 11,013
MMBtu
TOTAL YEARLY COSTS $336,417
RECOMMENDED SAVINGS* $140,994 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 4.651: Install back-up equipment $125,769 $50,000 - - - $125,769
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,428 $3,300 $4,423
192,394
kWh
$2,005
-
kW-mo/yr
- -
03 2.7261: Install timers and/or thermostats $1,179 $800 $1,179
51,280
kWh
- - -
04 2.7135: Install occupancy sensors $651 $1,275 $651
28,305
kWh
- - -
05 2.2442: Preheat combustion air with waste heat $1,588 $5,000 $(-300.0)
(-13,034)
kWh
$(-137.0)
-
kW-mo/yr
$2,025
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,173 $4,403 $517
22,464
kWh
$656
-
kW-mo/yr
- -
07 2.7232: Replace existing hvac unit with high efficiency model $4,206 $19,974 $3,074
133,674
kWh
$1,132
-
kW-mo/yr
- -
TOTAL RECOMMENDED $140,994 $84,752 $9,544
415,083
kWh
$3,656
-
kW-mo/yr
$2,025
-
MMBtu
$125,769
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs