ITAC Assessment: GT0116
ITAC logo
ITAC Assessment: GT0116
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product THERMOFORMED PLASTIC
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area
n/a
Annual Production 1,550,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $847,982 25,145,956
kWh
Natural Gas $33,564 9,424
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,846 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,846

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,021 $400 $2,021
60,082
kWh
02 2.7111: Reduce illumination to minimum necessary levels $9,712 - $9,712
288,101
kWh
03 2.2694: Use highest temperature for chilling or cold storage $1,841 - $1,841
54,513
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $15,272 $150 $15,272
452,814
kWh
TOTAL RECOMMENDED $28,846 $550 $28,846
855,510
kWh
TOTAL IMPLEMENTED $28,846 $550 $28,846
855,510
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs