623
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UU0288 #03 Y:2025 | 03 | 2025 | Recover waste heat from equipment | $15,325 | $47,180 | |
| UU0288 #01 Y:2025 | 01 | 2025 | Install an uninteruptable power supply | $150,000 | $1,225,000 | |
| UU0285 #06 Y:2025 | 06 | 2025 | Eliminate or reduce compressed air usage | $2,160 | $1,440 | |
| UU0285 #02 Y:2025 | 02 | 2025 | Eliminate or reduce compressed air usage | $1,860 | $600 | |
| UU0285 #01 Y:2025 | 01 | 2025 | Use solar heat to make electricty | $31,860 | $229,725 | |
| UU0264 #09 Y:2024 | 09 | 2024 | Use solar heat to make electricty | $44,517 | $717,537 | |
| UU0264 #08 Y:2024 | 08 | 2024 | Install occupancy sensors | $538 | $1,531 | |
| UU0264 #01 Y:2024 | 01 | 2024 | Install automatic boiler fuel feed system | $79,422 | $143,652 | |
| OR0796 #04 Y:2024 | 04 | 2024 | Use solar heat to make electricty | $130,526 | $1,312,500 | |
| OR0796 #03 Y:2024 | 03 | 2024 | Install adequate dryers on air lines to eliminate blowdown | $584 | $2,239 | |
| OR0796 #02 Y:2024 | 02 | 2024 | Adopt in-house material generation | $86,946 | $168,430 | |
| OR0796 #01 Y:2024 | 01 | 2024 | Install / repair insulation on steam lines | $733 | $546 | |
| UU0248 #07 Y:2024 | 07 | 2024 | Use or replace with energy efficient substitutes | $1,570 | $9,360 | |
| UU0248 #05 Y:2024 | 05 | 2024 | Replace fossil fuel equipment with electrical equipment | $6,380 | $133,800 | |
| UU0248 #03 Y:2024 | 03 | 2024 | Use automatic flow control | $820 | $4,250 | |
| UU0247 #03 Y:2024 | 03 | 2024 | Use optimum size and capacity equipment | $200,000 | $717,040 | |
| UU0247 #02 Y:2024 | 02 | 2024 | Recover waste heat from equipment | $1,770 | $9,500 | |
| UU0235 #04 Y:2023 | 04 | 2023 | Use optimum thickness insulation | $6,968 | $8,826 | |
| UU0235 #03 Y:2023 | 03 | 2023 | Insulate bare equipment | $12,478 | $23,282 | |
| UU0235 #02 Y:2023 | 02 | 2023 | Use steam sparging or injections in place of indirect heating | $271,861 | $3,050,000 |