| Assessment Year | 2021 |
|---|---|
| Principal Product | Aerospace composites |
| NAICS | 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing |
| SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 105 |
| Plant Area |
49,600
ft2
|
| Annual Production | 6,000
units
|
| Production Hrs. Annual | 2,210
hrs
|
| Location (State) | Idaho |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $129,516 | 2,030,080 |
kWh
|
$0.064 |
| Electricity Demand | $36,344 | 8,385 |
kW-mo/yr
|
$4.33 |
| Natural Gas | $29,628 | 5,352 |
MMBtu
|
$5.54 |
| TOTAL YEARLY COSTS | $195,488 | |||
| RECOMMENDED SAVINGS* | $197,884 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Raw Material Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,750 | $3,231 |
$2,009
31,493
kWh
|
$741
-
kW-mo/yr
|
- | - | |
| 02 | 2.7135: Install occupancy sensors | $679 | $280 |
$679
10,637
kWh
|
- | - | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,232 | $320 |
$1,962
31,140
kWh
|
$270
-
kW-mo/yr
|
- | - | |
| 04 | 2.4239: Eliminate or reduce compressed air usage | $766 | $25 |
$766
12,000
kWh
|
- | - | - | |
| 05 | 4.212: Adopt in-house material generation | $182,277 | $204,462 | - | - | - | $182,277 | |
| 06 | 2.2437: Recover waste heat from equipment | $8,288 | $6,000 | - | - |
$8,288
-
MMBtu
|
- | |
| 07 | 2.2531: Re-size charging openings or add movable cover or door | $893 | $710 |
$893
14,252
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $197,884 | $215,028 |
$6,308
99,522
kWh
|
$1,011
-
kW-mo/yr
|
$8,288
-
MMBtu
|
$182,277 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Raw Material Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs