ITAC Assessment: BS0154
ITAC logo
ITAC Assessment: BS0154
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Aerospace composites
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area 49,600
ft2
Annual Production 6,000
units
Production Hrs. Annual 2,210
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $129,516 2,030,080
kWh
Electricity Demand $36,344 8,385
kW-mo/yr
Natural Gas $29,628 5,352
MMBtu
TOTAL YEARLY COSTS $195,488
RECOMMENDED SAVINGS* $197,884 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,750 $3,231 $2,009
31,493
kWh
$741
-
kW-mo/yr
- -
02 2.7135: Install occupancy sensors $679 $280 $679
10,637
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,232 $320 $1,962
31,140
kWh
$270
-
kW-mo/yr
- -
04 2.4239: Eliminate or reduce compressed air usage $766 $25 $766
12,000
kWh
- - -
05 4.212: Adopt in-house material generation $182,277 $204,462 - - - $182,277
06 2.2437: Recover waste heat from equipment $8,288 $6,000 - - $8,288
-
MMBtu
-
07 2.2531: Re-size charging openings or add movable cover or door $893 $710 $893
14,252
kWh
- - -
TOTAL RECOMMENDED $197,884 $215,028 $6,308
99,522
kWh
$1,011
-
kW-mo/yr
$8,288
-
MMBtu
$182,277
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs