ITAC Assessment: BS0149
ITAC logo
ITAC Assessment: BS0149
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Particle Board
NAICS 321999: All Other Miscellaneous Wood Product Manufacturing
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 140
Plant Area 2,064,163
ft2
Annual Production 130,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Montana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,382,504 49,784,668
kWh
Electricity Demand $549,098 82,127
kW-mo/yr
Natural Gas $1,721,267 473,100
MMBtu
TOTAL YEARLY COSTS $4,652,868
RECOMMENDED SAVINGS* $73,489 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.6124: Establish equipment maintenance schedule $9,819 $23 $8,247
171,811
kWh
$1,573
-
kW-mo/yr
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $7,317 $313 $5,790
120,635
kWh
$1,527
-
kW-mo/yr
03 2.4221: Install compressor air intakes in coolest locations $23,678 $1,000 $19,987
402,960
kWh
$3,691
-
kW-mo/yr
04 2.7142: Utilize higher efficiency lamps and/or ballasts $13,150 $13,435 $11,047
230,143
kWh
$2,103
-
kW-mo/yr
05 2.4231: Reduce the pressure of compressed air to the minimum required $19,525 $50 $16,396
341,586
kWh
$3,129
-
kW-mo/yr
TOTAL RECOMMENDED $73,489 $14,821 $61,467
1,267,135
kWh
$12,023
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs