ITAC Assessment: UU0224
ITAC logo
ITAC Assessment: UU0224
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Energy bars
NAICS 311351: Chocolate and Confectionery Manufacturing from Cacao Beans
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 400
Plant Area 300,000
ft2
Annual Production 200,000
units
Production Hrs. Annual 8,160
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $668,567 11,216,803
kWh
Electricity Demand $141,614 23,669
kW-mo/yr
Electricity Fees $163,268 -
Natural Gas $94,081 15,074
MMBtu
TOTAL YEARLY COSTS $1,067,530
RECOMMENDED SAVINGS* $46,264 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,040

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $22,006 $51 $19,192
319,872
kWh
$2,814
-
kW-mo/yr
-
02 2.7311: Ventilation system to shut off when room is not in use $10,206 $7,560 $10,206
170,105
kWh
- -
03 2.4239: Eliminate or reduce compressed air usage $7,006 $10,650 $6,110
101,836
kWh
$896
-
kW-mo/yr
-
04 2.4221: Install compressor air intakes in coolest locations $3,361 $1,485 $2,916
48,600
kWh
$445
-
kW-mo/yr
-
05 2.8113: Purchase gas directly from a contract gas supplier $2,224 $4,500 - - $2,224
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,460 $1,382 $1,460
24,317
kWh
- -
TOTAL RECOMMENDED $46,264 $25,628 $39,884
664,730
kWh
$4,156
-
kW-mo/yr
$2,224
TOTAL IMPLEMENTED $44,040 $21,128 $39,884
664,730
kWh
$4,156
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs