ITAC Assessment: LL0165
ITAC logo
ITAC Assessment: LL0165
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Oil and lubricant addatives
NAICS 324191: Petroleum Lubricating Oil and Grease Manufacturing
SIC 2992: Lubricating Oils and Greases
Sales Range $100
M
to 500
M
# of Employees 350
Plant Area 4,356,000
ft2
Annual Production 70,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Natural Gas $9,781,506 2,756,129
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,406,451 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,341,552

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2135: Repair and eliminate steam leaks $1,037,596 $14,410 $1,037,596
-
MMBtu
- -
02 2.2113: Repair or replace steam traps $295,550 $63,360 $295,550
-
MMBtu
- -
03 2.2121: Increase amount of condensate returned $55,698 $230,000 - - $55,698
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,201 $3,240 $9,201
-
MMBtu
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $7,848 $3,500 $3,813
-
MMBtu
$1,817 $2,218
06 2.7135: Install occupancy sensors $292 $26 $292
-
MMBtu
- -
07 2.2511: Insulate bare equipment $266 $349 $266
-
MMBtu
- -
TOTAL RECOMMENDED $1,406,451 $314,885 $1,346,718
-
MMBtu
$1,817 $57,916
TOTAL IMPLEMENTED $1,341,552 $81,645 $1,337,517
-
MMBtu
$1,817 $2,218
Yearly Savings* Imp'd Cost* Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs