ITAC Assessment: DL0236
ITAC logo
ITAC Assessment: DL0236
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Canned seafood
NAICS 311710: Seafood Product Preparation and Packaging
SIC 2091: Canned and Cured Fish and Seafoods
Sales Range $50
M
to 100
M
# of Employees 235
Plant Area 166,821
ft2
Annual Production 50,000,000
lb
Production Hrs. Annual 7,620
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $460,713 5,658,000
kWh
Electricity Demand $230,937 15,554
kW-mo/yr
Electricity Fees $4,990 -
Natural Gas $488,308 87,163
MMBtu
Waste Disposal Costs
Water Usage $272,368 94,562
Tgal
TOTAL YEARLY COSTS $1,457,316
RECOMMENDED SAVINGS* $208,797 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $13,849 - $9,195
113,520
kWh
$4,654
-
kW-mo/yr
-
02 2.2441: Preheat boiler makeup water with waste process heat $19,869 $2,400 - - $19,869
-
MMBtu
03 2.7313: Recycle air for heating, ventilation and air conditioning $3,343 $1,500 - - $3,343
-
MMBtu
04 2.4224: Upgrade controls on compressors $4,721 $1,500 $3,134
38,694
kWh
$1,587
-
kW-mo/yr
-
05 4.443: Install automatic boiler fuel feed system $18,917 $52,500 - - $18,917
-
MMBtu
06 2.2628: Utilize a less expensive cooling method $4,131 - $2,742
33,857
kWh
$1,389
-
kW-mo/yr
-
07 2.4323: Use optimum size and capacity equipment $22,162 $53,200 $14,714
181,655
kWh
$7,448
-
kW-mo/yr
-
08 2.4322: Use or replace with energy efficient substitutes $14,945 $28,600 $9,923
122,501
kWh
$5,022
-
kW-mo/yr
-
09 2.4226: Use / purchase optimum sized compressor $57,286 $101,040 $38,034
469,559
kWh
$19,252
-
kW-mo/yr
-
10 2.4226: Use / purchase optimum sized compressor $23,405 $56,000 $15,539
191,844
kWh
$7,866
-
kW-mo/yr
-
11 2.2449: Recover heat from exhausted steam, hot air or hot water $19,869 $1,512 - - $19,869
-
MMBtu
12 2.7313: Recycle air for heating, ventilation and air conditioning $6,300 $3,500 - - $6,300
-
MMBtu
TOTAL RECOMMENDED $208,797 $301,752 $93,282
1,151,630
kWh
$47,217
-
kW-mo/yr
$68,298
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs