Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,195

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TT0301 #02 Y:2023 Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $40,702 $210,000
TT0301 #01 Y:2023 Use waste heat from hot flue gases to preheat $47,506 $76,760
OK1094 #06 Y:2023 Use waste heat from hot flue gases to preheat $11,239 $12,700
OK1094 #05 Y:2023 Use solar heat to make electricty $93,859 $858,000
OK1094 #01 Y:2023 Install compressor air intakes in coolest locations $2,672 $2,688
MZ0341 #04 Y:2022 Reduce the pressure of compressed air to the minimum required $3,207 $160
MZ0341 #03 Y:2022 Direct warmest air to combustion intake $12,536 $16,400
MZ0341 #02 Y:2022 Analyze flue gas for proper air/fuel ratio $13,839 $3,000
MZ0341 #01 Y:2022 Reschedule plant operations or reduce load to avoid peaks $18,080 $9,000
TT0291 #06 Y:2022 Install soft-start to eliminate nuisance trips $2,088 $4,500
TT0291 #04 Y:2022 Use optimum thickness insulation $14,929 $45,390
TT0291 #03 Y:2022 Purchase appropriately sized material $18,022 $87,000
TT0291 #01 Y:2022 Recover heat from exhausted steam, hot air or hot water $44,264 $3,287
LT8363 #07 Y:2022 Reduce the pressure of compressed air to the minimum required $1,254 -
LT8363 #06 Y:2022 Preheat boiler makeup water with waste process heat $23,817 $51,385
LT8363 #05 Y:2022 Clean or color roof to reduce solar load $22,308 $32,500
LT8363 #04 Y:2022 Change procedures / equipment / operating conditions $14,468 $15,975
LT8363 #03 Y:2022 Utilize higher efficiency lamps and/or ballasts $24,542 $2,945
LT8363 #02 Y:2022 Change operating conditions $46,622 -
LT8363 #01 Y:2022 Optimize plant power factor $5,980 $10,022