1,195
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
TT0301 #02 Y:2023 | 02 | 2023 | Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat | $40,702 | $210,000 | |
TT0301 #01 Y:2023 | 01 | 2023 | Use waste heat from hot flue gases to preheat | $47,506 | $76,760 | |
OK1094 #06 Y:2023 | 06 | 2023 | Use waste heat from hot flue gases to preheat | $11,239 | $12,700 | |
OK1094 #05 Y:2023 | 05 | 2023 | Use solar heat to make electricty | $93,859 | $858,000 | |
OK1094 #01 Y:2023 | 01 | 2023 | Install compressor air intakes in coolest locations | $2,672 | $2,688 | |
MZ0341 #04 Y:2022 | 04 | 2022 | Reduce the pressure of compressed air to the minimum required | $3,207 | $160 | |
MZ0341 #03 Y:2022 | 03 | 2022 | Direct warmest air to combustion intake | $12,536 | $16,400 | |
MZ0341 #02 Y:2022 | 02 | 2022 | Analyze flue gas for proper air/fuel ratio | $13,839 | $3,000 | |
MZ0341 #01 Y:2022 | 01 | 2022 | Reschedule plant operations or reduce load to avoid peaks | $18,080 | $9,000 | |
TT0291 #06 Y:2022 | 06 | 2022 | Install soft-start to eliminate nuisance trips | $2,088 | $4,500 | |
TT0291 #04 Y:2022 | 04 | 2022 | Use optimum thickness insulation | $14,929 | $45,390 | |
TT0291 #03 Y:2022 | 03 | 2022 | Purchase appropriately sized material | $18,022 | $87,000 | |
TT0291 #01 Y:2022 | 01 | 2022 | Recover heat from exhausted steam, hot air or hot water | $44,264 | $3,287 | |
LT8363 #07 Y:2022 | 07 | 2022 | Reduce the pressure of compressed air to the minimum required | $1,254 | - | |
LT8363 #06 Y:2022 | 06 | 2022 | Preheat boiler makeup water with waste process heat | $23,817 | $51,385 | |
LT8363 #05 Y:2022 | 05 | 2022 | Clean or color roof to reduce solar load | $22,308 | $32,500 | |
LT8363 #04 Y:2022 | 04 | 2022 | Change procedures / equipment / operating conditions | $14,468 | $15,975 | |
LT8363 #03 Y:2022 | 03 | 2022 | Utilize higher efficiency lamps and/or ballasts | $24,542 | $2,945 | |
LT8363 #02 Y:2022 | 02 | 2022 | Change operating conditions | $46,622 | - | |
LT8363 #01 Y:2022 | 01 | 2022 | Optimize plant power factor | $5,980 | $10,022 |