ITAC Assessment: MZ0341
ITAC logo
ITAC Assessment: MZ0341
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Packaged Turkey Products
NAICS 311615: Poultry Processing
SIC 2015: Poultry Slaughtering and Processing
Sales Range $100
M
to 500
M
# of Employees 500
Plant Area 250,000
ft2
Annual Production 2,500,000
units
Production Hrs. Annual 4,160
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,878,403 39,522,000
kWh
Electricity Demand $304,956 97,742
kW-mo/yr
Electricity Fees $65,599 -
Natural Gas $974,565 115,040
MMBtu
TOTAL YEARLY COSTS $3,223,523
RECOMMENDED SAVINGS* $47,662 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $18,080 $9,000 - $18,080
-
kW-mo/yr
- -
02 2.1233: Analyze flue gas for proper air/fuel ratio $13,839 $3,000 - - $13,959
-
MMBtu
$(-120.0)
03 2.1213: Direct warmest air to combustion intake $12,536 $16,400 - - $12,536
-
MMBtu
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $3,207 $160 $2,942
61,943
kWh
$265
-
kW-mo/yr
- -
TOTAL RECOMMENDED $47,662 $28,560 $2,942
61,943
kWh
$18,345
-
kW-mo/yr
$26,495
-
MMBtu
$(-120.0)
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs