ITAC Assessment: LE0462
ITAC logo
ITAC Assessment: LE0462
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Head Wear
NAICS 339999: All Other Miscellaneous Manufacturing
SIC 2353: Hats, Caps, and Millinery
Sales Range $10
M
to 50
M
# of Employees 253
Plant Area 500,000
ft2
Annual Production 317,000
units
Production Hrs. Annual 2,000
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $114,619 2,105,498
kWh
Electricity Demand $24,459 8,208
kW-mo/yr
Electricity Fees $16,362 -
Natural Gas $221,782 41,172
MMBtu
TOTAL YEARLY COSTS $377,222
RECOMMENDED SAVINGS* $24,408 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,595

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,915 $1,000 $2,405
44,530
kWh
$510
-
kW-mo/yr
-
02 2.2441: Preheat boiler makeup water with waste process heat $15,808 $20,000 - - $15,808
-
MMBtu
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $226 $355 $189
3,491
kWh
$38
-
kW-mo/yr
-
04 2.4221: Install compressor air intakes in coolest locations $1,005 $2,000 $829
15,355
kWh
$176
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,454 $24,417 $3,674
68,016
kWh
$780
-
kW-mo/yr
-
TOTAL RECOMMENDED $24,408 $47,772 $7,097
131,392
kWh
$1,504
-
kW-mo/yr
$15,808
-
MMBtu
TOTAL IMPLEMENTED $7,595 $25,772 $6,268
116,037
kWh
$1,328
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs