Assessment Year | 2018 |
---|---|
Principal Product | Head Wear |
NAICS | 339999: All Other Miscellaneous Manufacturing |
SIC | 2353: Hats, Caps, and Millinery |
Sales Range | $10 M to 50M |
# of Employees | 253 |
Plant Area |
500,000
ft2
|
Annual Production | 317,000
units
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $114,619 | 2,105,498 |
kWh
|
$0.054 |
Electricity Demand | $24,459 | 8,208 |
kW-mo/yr
|
$2.98 |
Electricity Fees | $16,362 | - |
|
- |
Natural Gas | $221,782 | 41,172 |
MMBtu
|
$5.39 |
TOTAL YEARLY COSTS | $377,222 | |||
RECOMMENDED SAVINGS* | $24,408 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,595 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,915 | $1,000 |
$2,405
44,530
kWh
|
$510
-
kW-mo/yr
|
- | |
02 | 2.2441: Preheat boiler makeup water with waste process heat | $15,808 | $20,000 | - | - |
$15,808
-
MMBtu
|
|
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $226 | $355 |
$189
3,491
kWh
|
$38
-
kW-mo/yr
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $1,005 | $2,000 |
$829
15,355
kWh
|
$176
-
kW-mo/yr
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,454 | $24,417 |
$3,674
68,016
kWh
|
$780
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $24,408 | $47,772 |
$7,097
131,392
kWh
|
$1,504
-
kW-mo/yr
|
$15,808
-
MMBtu
|
||
TOTAL IMPLEMENTED | $7,595 | $25,772 |
$6,268
116,037
kWh
|
$1,328
-
kW-mo/yr
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs