ITAC Assessment: TT0319
ITAC logo
ITAC Assessment: TT0319
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Flat rolled steel sheet & coil
NAICS 331221: Rolled Steel Shape Manufacturing
SIC 3316: Cold-Rolled Steel Sheet, Strip, and Bars
Sales Range $10
M
to 50
M
# of Employees 55
Plant Area 513,633
ft2
Annual Production 1,500,000
units
Production Hrs. Annual 4,160
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $119,126 2,292,732
kWh
Electricity Demand $39,594 11,005
kW-mo/yr
Natural Gas $29,122 2,276
MMBtu
LPG $16,884 869
MMBtu
Waste Disposal Costs
Water Usage $3,951 299
Tgal
TOTAL YEARLY COSTS $208,677
RECOMMENDED SAVINGS* $99,543 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.9114: Use solar heat to make electricty $46,802 $502,083 $46,802
900,032
kWh
- - - - -
02 2.1321: Replace fossil fuel equipment with electrical equipment $21,264 $88,000 $(-768.0)
(-14,773)
kWh
- - $16,884
-
MMBtu
$5,148 -
03 2.7442: Keep doors and windows shut when not on use $9,169 - $5,036
96,847
kWh
- $4,133
-
MMBtu
- - -
04 2.8114: Change rate schedules or other changes in utility service $6,842 - - - - - - $6,842
05 2.7261: Install timers and/or thermostats $5,922 $7,350 $5,922
113,885
kWh
- - - - -
06 2.7135: Install occupancy sensors $4,645 $900 $4,645
89,259
kWh
- - - - -
07 2.6218: Turn off equipment when not in use $4,402 $3,250 $4,402
84,667
kWh
- - - - -
08 2.4231: Reduce the pressure of compressed air to the minimum required $497 $32 $454
8,726
kWh
$43
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $99,543 $601,615 $66,493
1,278,643
kWh
$43
-
kW-mo/yr
$4,133
-
MMBtu
$16,884
-
MMBtu
$5,148 $6,842
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs