| Assessment Year | 2024 |
|---|---|
| Principal Product | HVAC equipment |
| NAICS | 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
| SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
| Sales Range | $100 M to 500M |
| # of Employees | 700 |
| Plant Area |
900,000
ft2
|
| Annual Production | 77,246
units
|
| Production Hrs. Annual | 7,488
hrs
|
| Location (State) | Arkansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $1,265,442 | 17,467,200 |
kWh
|
$0.072 | |
| Electricity Demand | $395,462 | 43,809 |
kW-mo/yr
|
$9.03 | |
| Natural Gas | $160,672 | 28,078 |
MMBtu
|
$5.72 | |
| Waste Disposal Costs | |||||
| Water Usage | $35,720 | 10,619 |
Tgal
|
$3.36 | |
| Water Disposal | $162,691 | 13,596 |
Tgal
|
$11.97 | |
| TOTAL YEARLY COSTS | $2,019,987 | ||||
| RECOMMENDED SAVINGS* | $215,250 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $59,748 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.3212: Optimize plant power factor | $38,052 | $31,569 | - | - | $38,052 | |
| 02 | 2.7261: Install timers and/or thermostats | $17,160 | $7,800 | - |
$17,160
-
MMBtu
|
- | |
| 03 | 2.6211: Conserve energy by efficient use of vending machines | $3,039 | $2,670 |
$3,039
42,195
kWh
|
- | - | |
| 04 | 2.9114: Use solar heat to make electricty | $151,456 | $1,065,000 |
$151,456
2,103,551
kWh
|
- | - | |
| 05 | 2.6218: Turn off equipment when not in use | $4,536 | - |
$4,536
63,000
kWh
|
- | - | |
| 06 | 2.2414: Use waste heat from hot flue gases to preheat | $1,007 | $7,840 | - |
$1,007
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $215,250 | $1,114,879 |
$159,031
2,208,746
kWh
|
$18,167
-
MMBtu
|
$38,052 | ||
| TOTAL IMPLEMENTED | $59,748 | $39,369 |
$4,536
63,000
kWh
|
$17,160
-
MMBtu
|
$38,052 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs