Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Salsa and Sauces
NAICS 311421: Fruit and Vegetable Canning
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 2,831,400
ft2
Annual Production 4,000,000
units
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $219,489 2,226,000
kWh
Electricity Demand $67,222 8,128
kW-mo/yr
Natural Gas $314,025 41,152
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $65,636 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $45,429

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2135: Repair and eliminate steam leaks $494 - - - $494
-
MMBtu
02 2.2511: Insulate bare equipment $22,857 $7,377 - - $22,857
-
MMBtu
03 2.4133: Use most efficient type of electric motors $1,828 $1,092 $1,618
15
kWh
$210
-
kW-mo/yr
-
04 2.4221: Install compressor air intakes in coolest locations $1,506 $1,461 $1,333
10,851
kWh
$173
-
kW-mo/yr
-
05 2.4239: Eliminate or reduce compressed air usage $1,080 $1,262 $959
9,205
kWh
$121
-
kW-mo/yr
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,338 $24,888 $3,666
35,192
kWh
$472
-
kW-mo/yr
$13,200
-
MMBtu
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,894 $3,026 $1,675
16,073
kWh
$219
-
kW-mo/yr
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $6,866 $15,620 $5,734
55,037
kWh
$1,132
-
kW-mo/yr
-
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,234 $9,460 $2,147
20,606
kWh
$1,087
-
kW-mo/yr
-
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $666 $2,370 $562
5,391
kWh
$104
-
kW-mo/yr
-
11 2.7142: Utilize higher efficiency lamps and/or ballasts $7,873 $33,600 $6,818
65,441
kWh
$1,055
-
kW-mo/yr
-
TOTAL RECOMMENDED $65,636 $100,156 $24,512
217,811
kWh
$4,573
-
kW-mo/yr
$36,551
-
MMBtu
TOTAL IMPLEMENTED $45,429 $43,186 $7,146
66,649
kWh
$1,732
-
kW-mo/yr
$36,551
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs