Assessment Year | 2021 |
---|---|
Principal Product | Jet engine airfoils |
NAICS | 336412: Aircraft Engine and Engine Parts Manufacturing |
SIC | 3724: Aircraft Engines and Engine Parts |
Sales Range | $10 M to 50M |
# of Employees | 174 |
Plant Area |
97,350
ft2
|
Annual Production | 65,333
pieces
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $575,792 | 7,197,401 |
kWh
|
$0.080 | |
Electricity Demand | $261,266 | 57,045 |
kW-mo/yr
|
$4.58 | |
Natural Gas | $7,196 | 1,135 |
MMBtu
|
$6.34 | |
Waste Disposal Costs | |||||
Water Usage | $6,367 | 1,292 |
Tgal
|
$4.93 | |
Water Disposal | $6,554 | 1,292 |
Tgal
|
$5.07 | |
TOTAL YEARLY COSTS | $857,175 | ||||
RECOMMENDED SAVINGS* | $43,411 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $29,792 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $11,834 | $16,500 | - | - | $11,834 | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $18,462 | $16,440 |
$18,462
230,775
kWh
|
- | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,980 | - |
$3,980
49,752
kWh
|
- | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $1,785 | $1,966 |
$1,630
20,376
kWh
|
$155
-
kW-mo/yr
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,155 | $26,670 |
$5,720
71,503
kWh
|
$435
-
kW-mo/yr
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,195 | $3,190 |
$1,195
14,936
kWh
|
- | - | |
TOTAL RECOMMENDED | $43,411 | $64,766 |
$30,987
387,342
kWh
|
$590
-
kW-mo/yr
|
$11,834 | ||
TOTAL IMPLEMENTED | $29,792 | $46,300 |
$29,357
366,966
kWh
|
$435
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs