ITAC Assessment: OK1053
ITAC logo
ITAC Assessment: OK1053
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Jet engine airfoils
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $10
M
to 50
M
# of Employees 174
Plant Area 97,350
ft2
Annual Production 65,333
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $575,792 7,197,401
kWh
Electricity Demand $261,266 57,045
kW-mo/yr
Natural Gas $7,196 1,135
MMBtu
Waste Disposal Costs
Water Usage $6,367 1,292
Tgal
Water Disposal $6,554 1,292
Tgal
TOTAL YEARLY COSTS $857,175
RECOMMENDED SAVINGS* $43,411 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,792

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.3212: Optimize plant power factor $11,834 $16,500 - - $11,834
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $18,462 $16,440 $18,462
230,775
kWh
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $3,980 - $3,980
49,752
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $1,785 $1,966 $1,630
20,376
kWh
$155
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $6,155 $26,670 $5,720
71,503
kWh
$435
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,195 $3,190 $1,195
14,936
kWh
- -
TOTAL RECOMMENDED $43,411 $64,766 $30,987
387,342
kWh
$590
-
kW-mo/yr
$11,834
TOTAL IMPLEMENTED $29,792 $46,300 $29,357
366,966
kWh
$435
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs