ITAC Assessment: TT0301
ITAC logo
ITAC Assessment: TT0301
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Hardwood Flooring
NAICS 321918: Other Millwork (including Flooring)
SIC 2426: Hardwood Dimension and Flooring Mills
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 192,000
ft2
Annual Production 1,800,000
units
Production Hrs. Annual 2,210
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $560,701 14,528,057
kWh
Electricity Demand $584,582 30,412
kW-mo/yr
Natural Gas $13,468 1,137
MMBtu
LPG $29,182 1,340
MMBtu
Wood $636,615 451,500
MMBtu
Waste Disposal Costs
Water Usage $34,352 14,155
Tgal
Water Disposal $56,268 14,155
Tgal
TOTAL YEARLY COSTS $1,915,168
RECOMMENDED SAVINGS* $147,320 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $59,112

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Wood Savings Administrative Changes Savings
01 2.2414: Use waste heat from hot flue gases to preheat $47,506 $76,760 - - - $47,506
-
MMBtu
-
02 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $40,702 $210,000 $59,174
1,533,000
kWh
$40,366
-
kW-mo/yr
- $(-43,508.0)
-
MMBtu
$(-15,330.0)
03 2.1321: Replace fossil fuel equipment with electrical equipment $32,720 $15,200 $(-3,090.0)
(-80,077)
kWh
- $29,182
-
MMBtu
- $6,628
04 2.6212: Turn off equipment during breaks, reduce operating time $9,607 - $9,607
248,900
kWh
- - - -
05 2.4237: Substitute compressed air cooling with water or air cooling $8,886 $220 $8,886
230,215
kWh
- - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,899 $1,500 $2,132
55,250
kWh
$5,767
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $147,320 $303,680 $76,709
1,987,288
kWh
$46,133
-
kW-mo/yr
$29,182
-
MMBtu
$3,998
-
MMBtu
$(-8,702.0)
TOTAL IMPLEMENTED $59,112 $16,920 $17,535
454,288
kWh
$5,767
-
kW-mo/yr
$29,182
-
MMBtu
- $6,628
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Wood Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs