Assessment Year | 2023 |
---|---|
Principal Product | Hardwood Flooring |
NAICS | 321918: Other Millwork (including Flooring) |
SIC | 2426: Hardwood Dimension and Flooring Mills |
Sales Range | $50 M to 100M |
# of Employees | 150 |
Plant Area |
192,000
ft2
|
Annual Production | 1,800,000
units
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $560,701 | 14,528,057 |
kWh
|
$0.039 | |
Electricity Demand | $584,582 | 30,412 |
kW-mo/yr
|
$19.22 | |
Natural Gas | $13,468 | 1,137 |
MMBtu
|
$11.85 | |
LPG | $29,182 | 1,340 |
MMBtu
|
$21.78 | |
Wood | $636,615 | 451,500 |
MMBtu
|
$1.41 | |
Waste Disposal Costs | |||||
Water Usage | $34,352 | 14,155 |
Tgal
|
$2.43 | |
Water Disposal | $56,268 | 14,155 |
Tgal
|
$3.98 | |
TOTAL YEARLY COSTS | $1,915,168 | ||||
RECOMMENDED SAVINGS* | $147,320 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $59,112 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Wood Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $47,506 | $76,760 | - | - | - |
$47,506
-
MMBtu
|
- | |
02 | 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat | $40,702 | $210,000 |
$59,174
1,533,000
kWh
|
$40,366
-
kW-mo/yr
|
- |
$(-43,508.0)
-
MMBtu
|
$(-15,330.0) | |
03 | 2.1321: Replace fossil fuel equipment with electrical equipment | $32,720 | $15,200 |
$(-3,090.0)
(-80,077)
kWh
|
- |
$29,182
-
MMBtu
|
- | $6,628 | |
04 | 2.6212: Turn off equipment during breaks, reduce operating time | $9,607 | - |
$9,607
248,900
kWh
|
- | - | - | - | |
05 | 2.4237: Substitute compressed air cooling with water or air cooling | $8,886 | $220 |
$8,886
230,215
kWh
|
- | - | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,899 | $1,500 |
$2,132
55,250
kWh
|
$5,767
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $147,320 | $303,680 |
$76,709
1,987,288
kWh
|
$46,133
-
kW-mo/yr
|
$29,182
-
MMBtu
|
$3,998
-
MMBtu
|
$(-8,702.0) | ||
TOTAL IMPLEMENTED | $59,112 | $16,920 |
$17,535
454,288
kWh
|
$5,767
-
kW-mo/yr
|
$29,182
-
MMBtu
|
- | $6,628 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Wood Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs