Assessment Year | 2022 |
---|---|
Principal Product | Metal finishing, powder coating, anodizing and plating |
NAICS | 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring |
SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 54 |
Plant Area |
120,000
ft2
|
Annual Production | 15,000
units
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | Rhode Island |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $91,916 | 794,400 |
kWh
|
$0.12 | |
Electricity Demand | $68,127 | 5,339 |
kW-mo/yr
|
$12.76 | |
Electricity Fees | $2,533 | - |
|
- | |
Natural Gas | $109,478 | 11,283 |
MMBtu
|
$9.70 | |
Waste Disposal Costs | |||||
Water Usage | $40,279 | 7,119 |
Tgal
|
$5.66 | |
Water Disposal | $5,710 | 7,119 |
Tgal
|
$0.80 | |
TOTAL YEARLY COSTS | $318,043 | ||||
RECOMMENDED SAVINGS* | $21,395 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $4,466 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $9,380 | $10,000 |
$1,359
11,748
kWh
|
$9,021
-
kW-mo/yr
|
- | $(-1,000.0) | |
02 | 2.3212: Optimize plant power factor | $5,525 | $7,135 | - |
$5,525
-
kW-mo/yr
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,466 | $23,175 |
$3,879
33,525
kWh
|
$587
-
kW-mo/yr
|
- | - | |
04 | 2.2437: Recover waste heat from equipment | $853 | $4,200 | - | - |
$853
-
MMBtu
|
- | |
05 | 2.2511: Insulate bare equipment | $597 | $895 | - | - |
$597
-
MMBtu
|
- | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $574 | $2,100 |
$574
4,961
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $21,395 | $47,505 |
$5,812
50,234
kWh
|
$15,133
-
kW-mo/yr
|
$1,450
-
MMBtu
|
$(-1,000.0) | ||
TOTAL IMPLEMENTED | $4,466 | $23,175 |
$3,879
33,525
kWh
|
$587
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs