ITAC Assessment: OD0016
ITAC logo
ITAC Assessment: OD0016
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Ready-mix concrete and dry morter mix
NAICS
n/a
SIC 3273: Ready-Mixed Concrete
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area 13,000
ft2
Annual Production 115,000,000
lb
Production Hrs. Annual 2,200
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $29,757 325,322
kWh
Natural Gas $58,728 13,149
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,294 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,025

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6126: Keep solid fuels / raw materials dry $9,000 $11,900 - $9,000
-
MMBtu
02 2.2511: Insulate bare equipment $1,640 $1,957 - $1,640
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,625 $800 $3,625
39,566
kWh
-
04 2.4133: Use most efficient type of electric motors $234 $413 $234
1,758
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $526 $401 $526
5,862
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $269 $347 $269
2,931
kWh
-
TOTAL RECOMMENDED $15,294 $15,818 $4,654
50,117
kWh
$10,640
-
MMBtu
TOTAL IMPLEMENTED $6,025 $3,571 $4,385
47,186
kWh
$1,640
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs