Assessment Year | 1995 |
---|---|
Principal Product | Ready-mix concrete and dry morter mix |
NAICS |
n/a
|
SIC | 3273: Ready-Mixed Concrete |
Sales Range | $1 M to 5M |
# of Employees | 30 |
Plant Area |
13,000
ft2
|
Annual Production | 115,000,000
lb
|
Production Hrs. Annual | 2,200
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $29,757 | 325,322 |
kWh
|
$0.091 |
Natural Gas | $58,728 | 13,149 |
MMBtu
|
$4.47 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $15,294 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,025 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.6126: Keep solid fuels / raw materials dry | $9,000 | $11,900 | - |
$9,000
-
MMBtu
|
|
02 | 2.2511: Insulate bare equipment | $1,640 | $1,957 | - |
$1,640
-
MMBtu
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,625 | $800 |
$3,625
39,566
kWh
|
- | |
04 | 2.4133: Use most efficient type of electric motors | $234 | $413 |
$234
1,758
kWh
|
- | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $526 | $401 |
$526
5,862
kWh
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $269 | $347 |
$269
2,931
kWh
|
- | |
TOTAL RECOMMENDED | $15,294 | $15,818 |
$4,654
50,117
kWh
|
$10,640
-
MMBtu
|
||
TOTAL IMPLEMENTED | $6,025 | $3,571 |
$4,385
47,186
kWh
|
$1,640
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs