ITAC Assessment: CO0257
ITAC logo
ITAC Assessment: CO0257
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product Packaged Tea
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 155,800
ft2
Annual Production 3,200,000
pieces
Production Hrs. Annual 5,425
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $178,375 3,041,325
kWh
Natural Gas $10,611 2,640
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,500 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,500

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8121: Apply for tax-free status for energy purchases $5,300 $250 - - $5,300
02 2.7224: Reduce space conditioning during non-working hours $1,490 $30 $800
31,067
kWh
$690
-
MMBtu
-
03 2.7314: Reduce ventilation air $1,270 $200 $140
2,345
kWh
$1,130
-
MMBtu
-
04 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $1,430 $1,000 - $1,430
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,400 $4,910 $1,400
69,754
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,350 $12,990 $3,350
57,151
kWh
- -
07 2.4133: Use most efficient type of electric motors $4,240 $7,670 $4,240
72,392
kWh
- -
08 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,020 $6,500 - - $2,020
TOTAL RECOMMENDED $20,500 $33,550 $9,930
232,709
kWh
$3,250
-
MMBtu
$7,320
TOTAL IMPLEMENTED $20,500 $33,550 $9,930
232,709
kWh
$3,250
-
MMBtu
$7,320
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs