Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Fiberglass Motor Home Parts
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 81
Plant Area 80,000
ft2
Annual Production 30,000
pieces
Production Hrs. Annual 2,500
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,382 1,215,709
kWh
Electricity Demand $42,438 5,004
kW-mo/yr
Natural Gas $13,463 2,151
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $376,689 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,856

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,633 $14,800 $2,924
35,756
kWh
$1,709
-
kW-mo/yr
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,315 $950 $2,712
33,411
kWh
$1,603
-
kW-mo/yr
- - - -
03 2.4224: Upgrade controls on compressors $2,717 $5,000 $1,759
21,688
kWh
$958
-
kW-mo/yr
- - - -
04 2.7261: Install timers and/or thermostats $993 $900 $993
12,309
kWh
- - - - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,311 - $811
9,965
kWh
$500
-
kW-mo/yr
- - - -
06 2.6231: Utilize controls to operate equipment only when needed $1,157 $1,125 - - $1,157
-
MMBtu
- - -
07 2.4322: Use or replace with energy efficient substitutes $844 $2,865 - - $844
-
MMBtu
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $3,268 $9,327 $2,181
26,671
kWh
$1,087
-
kW-mo/yr
- - - -
09 2.7144: Install spectral reflectors / delamp $2,966 $3,120 $2,020
24,912
kWh
$946
-
kW-mo/yr
- - - -
10 2.4322: Use or replace with energy efficient substitutes $338,670 $24,000 - - - - $338,670
-
lb
-
11 3.6112: Use filter and drying oven to reduce sludge volume $3,800 $1,200 - - - $3,800
-
gal
- -
12 3.7131: Use a rag recycle service $8,640 $200 - - - - $8,640
-
lb
-
13 2.7142: Utilize higher efficiency lamps and/or ballasts $3,375 $4,864 - - - - - $3,375
TOTAL RECOMMENDED $376,689 $68,351 $13,400
164,712
kWh
$6,803
-
kW-mo/yr
$2,001
-
MMBtu
$3,800
-
gal
$347,310
-
lb
$3,375
TOTAL IMPLEMENTED $20,856 $25,277 $7,817
95,838
kWh
$4,399
-
kW-mo/yr
- - $8,640
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs