ITAC Assessment: NL0002
ITAC logo
ITAC Assessment: NL0002
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product treatment wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $500
k
to 1
M
# of Employees 3
Plant Area 8,000
ft2
Annual Production 657,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $138,432 150,000
kWh
Natural Gas $1,700 145
MMBtu
Waste Disposal Costs
Other Liquid (non-haz) $1,300 21
gal
TOTAL YEARLY COSTS $141,432
RECOMMENDED SAVINGS* $25,821 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,585

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Liquid (haz) Savings
01 3.1191: Change procedures / equipment / operating conditions $17,000 $20,000 $15,800
78,000
kWh
$1,200
-
gal
02 2.4133: Use most efficient type of electric motors $360 $1,000 $360
7,500
kWh
-
03 2.7134: Use photocell controls $1,225 $2,000 $1,225
8,000
kWh
-
04 2.6231: Utilize controls to operate equipment only when needed $7,236 $40,000 $7,236
103,914
kWh
-
TOTAL RECOMMENDED $25,821 $63,000 $24,621
197,414
kWh
$1,200
-
gal
TOTAL IMPLEMENTED $1,585 $3,000 $1,585
15,500
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs