ITAC Assessment: GT0639
ITAC logo
ITAC Assessment: GT0639
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Carpet
NAICS
n/a
SIC 2273: Carpets and Rugs
Sales Range $10
M
to 50
M
# of Employees 225
Plant Area 350,000
ft2
Annual Production 1,850,000
pieces
Production Hrs. Annual 2,500
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,800 2,520,516
kWh
Electricity Demand $119,375 9,084
kW-mo/yr
Electricity Fees $14,448 -
Natural Gas $198,614 64,378
MMBtu
LPG $16,549 2,613
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $312,199 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings Primary Product Savings
01 2.8112: Combine utility meters $10,670 - n/a - - - - - - $10,670 - - -
02 2.4226: Use / purchase optimum sized compressor $8,406 $5,000 n/a $2,370
87,925
kWh
$5,560
-
kW-mo/yr
$476 - - - - - - -
03 2.1233: Analyze flue gas for proper air/fuel ratio $3,573 - n/a - - - $4,473
-
MMBtu
- $(-900.0) - - - -
04 4.114: Add/modify equipment to improve drying process $200,000 - n/a - - - - - - - - - $200,000
05 2.2514: Cover open tanks $66,490 $87,860 n/a - - - $40,900
-
MMBtu
$25,150
-
Tgal
- - $440 - -
06 2.2414: Use waste heat from hot flue gases to preheat $6,600 $10,500 n/a - - - $6,600
-
MMBtu
- - - - - -
07 2.2437: Recover waste heat from equipment $1,800 $1,000 n/a - - - $1,800
-
MMBtu
- - - - - -
08 3.4155: Meter waste water $1,180 $2,350 n/a - - - - - - - - $1,180
-
Tgal
-
09 3.6193: Install equipment (eg compactor) to reduce disposal costs $13,480 - n/a - - - - - - - $13,480 - -
TOTAL RECOMMENDED $312,199 $106,710 $2,370
87,925
kWh
$5,560
-
kW-mo/yr
$476 $53,773
-
MMBtu
$25,150
-
Tgal
$(-900.0) $10,670 $13,920 $1,180
-
Tgal
$200,000
TOTAL IMPLEMENTED - - - - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs