ITAC Assessment: MA0580
ITAC logo
ITAC Assessment: MA0580
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Decorated bags and business accessories
NAICS 314910: Textile Bag and Canvas Mills
SIC 2393: Textile Bags
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area 145,000
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 4,680
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $267,573 3,104,000
kWh
Electricity Demand $34,165 7,270
kW-mo/yr
Electricity Fees $5,356 -
Natural Gas $113,115 11,818
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,758 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,074

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7243: Improve air circulation with destratification fans / other methods $9,175 $6,831 $(-1,236.0)
(-14,560)
kWh
$(-101.0)
-
kW-mo/yr
$10,512
-
MMBtu
-
02 2.2212: Use minimum safe oven ventilation $8,663 $10,750 - - $8,663
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $7,371 $34,720 $6,052
71,285
kWh
$922
-
kW-mo/yr
- $397
04 2.7224: Reduce space conditioning during non-working hours $5,798 $1,375 - - $5,798
-
MMBtu
-
05 2.6212: Turn off equipment during breaks, reduce operating time $1,905 - $1,905
22,440
kWh
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,479 $825 $1,479
17,421
kWh
- - -
07 2.6212: Turn off equipment during breaks, reduce operating time $611 - $551
6,500
kWh
- $60
-
MMBtu
-
08 2.2531: Re-size charging openings or add movable cover or door $444 - $166
1,953
kWh
- $278
-
MMBtu
-
09 2.6212: Turn off equipment during breaks, reduce operating time $312 - $312
3,680
kWh
- - -
TOTAL RECOMMENDED $35,758 $54,501 $9,229
108,719
kWh
$821
-
kW-mo/yr
$25,311
-
MMBtu
$397
TOTAL IMPLEMENTED $15,074 $36,095 $7,957
93,725
kWh
$922
-
kW-mo/yr
$5,798
-
MMBtu
$397
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs