| Assessment Year | 1991 |
|---|---|
| Principal Product | STAINLESS STEEL WIRE |
| NAICS |
n/a
|
| SIC | 3496: Miscellaneous Fabricated Wire Products |
| Sales Range | $5 M to 10M |
| # of Employees | 28 |
| Plant Area |
n/a
|
| Annual Production | 2,400,000
lb
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $105,033 | 1,733,587 |
kWh
|
$0.061 |
| Natural Gas | $65,646 | 12,575 |
MMBtu
|
$5.22 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $45,326 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $45,326 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $15,430 | - |
$24,120
400,059
kWh
|
$(-8,690.0)
-
MMBtu
|
- | |
| 02 | 2.7111: Reduce illumination to minimum necessary levels | $439 | $140 |
$439
7,327
kWh
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,377 | - |
$1,465
24,326
kWh
|
- | $(-88.0) | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $120 | $30 |
$120
2,052
kWh
|
- | - | |
| 05 | 2.7261: Install timers and/or thermostats | $18,000 | $300 | - |
$18,000
-
MMBtu
|
- | |
| 06 | 2.2136: Install / repair insulation on steam lines | $80 | $130 | - |
$80
-
MMBtu
|
- | |
| 07 | 2.2514: Cover open tanks | $9,880 | $7,550 | - |
$9,880
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $45,326 | $8,150 |
$26,144
433,764
kWh
|
$19,270
-
MMBtu
|
$(-88.0) | ||
| TOTAL IMPLEMENTED | $45,326 | $8,150 |
$26,144
433,764
kWh
|
$19,270
-
MMBtu
|
$(-88.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs