ITAC Assessment: OK1094
ITAC logo
ITAC Assessment: OK1094
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product polyethylene film
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 195,000
ft2
Annual Production 15,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,331,399 20,464,400
kWh
Electricity Demand $434,755 39,373
kW-mo/yr
Natural Gas $346,779 42,536
MMBtu
Waste Disposal Costs
Water Usage $16,016 4,139
Tgal
Water Disposal $21,373 4,139
Tgal
TOTAL YEARLY COSTS $2,150,322
RECOMMENDED SAVINGS* $139,150 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,380

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $2,672 $2,688 $2,672
41,122
kWh
- -
02 2.7232: Replace existing hvac unit with high efficiency model $3,917 $22,000 $3,917
60,264
kWh
- -
03 2.7261: Install timers and/or thermostats $573 $870 $369
5,669
kWh
- $204
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $26,890 $94,115 $21,441
329,865
kWh
$5,449
-
kW-mo/yr
-
05 2.9114: Use solar heat to make electricty $93,859 $858,000 $93,859
1,443,987
kWh
- -
06 2.2414: Use waste heat from hot flue gases to preheat $11,239 $12,700 - - $11,239
-
MMBtu
TOTAL RECOMMENDED $139,150 $990,373 $122,258
1,880,907
kWh
$5,449
-
kW-mo/yr
$11,443
-
MMBtu
TOTAL IMPLEMENTED $31,380 $116,985 $25,727
395,798
kWh
$5,449
-
kW-mo/yr
$204
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs