Assessment Year | 2022 |
---|---|
Principal Product | Water |
NAICS | 221310: Water Supply and Irrigation Systems |
SIC | 4941: Water Supply |
Sales Range | $1 M to 5M |
# of Employees | 13 |
Plant Area |
55,000
ft2
|
Annual Production | 1,000,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $101,487 | 1,564,510 |
kWh
|
$0.065 |
Electricity Demand | $30,394 | 2,881 |
kW-mo/yr
|
$10.55 |
Natural Gas | $4,725 | 324 |
MMBtu
|
$14.58 |
TOTAL YEARLY COSTS | $136,606 | |||
RECOMMENDED SAVINGS* | $44,237 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,877 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.5195: Change product design to reduce energy requirements | $14,598 | $23,000 |
$11,939
183,960
kWh
|
$2,659
-
kW-mo/yr
|
- | - | - | |
02 | 2.4322: Use or replace with energy efficient substitutes | $13,775 | $16,600 |
$11,264
173,558
kWh
|
$2,511
-
kW-mo/yr
|
- | - | - | |
03 | 3.6126: Direct waste gasses to boiler combustion air | $4,724 | $12,236 | - | - |
$4,724
-
MMBtu
|
- | - | |
04 | 4.661: Level zero – install control systems for existing equipment | $4,626 | $4,080 |
$3,782
58,271
kWh
|
$844
-
kW-mo/yr
|
- | - | - | |
05 | 2.7135: Install occupancy sensors | $2,533 | $1,543 |
$2,079
32,038
kWh
|
$454
-
kW-mo/yr
|
- | - | - | |
06 | 4.661: Level zero – install control systems for existing equipment | $1,637 | $5,130 |
$1,637
25,229
kWh
|
- | - | - | - | |
07 | 2.4157: Establish a predictive maintenance program | $1,011 | $1,500 |
$1,323
20,388
kWh
|
$295
-
kW-mo/yr
|
- | $(-607.0) | - | |
08 | 2.4151: Develop a repair/replace policy | $640 | $1,280 |
$573
8,822
kWh
|
$127
-
kW-mo/yr
|
- | $(-60.0) | - | |
09 | 2.2511: Insulate bare equipment | $447 | $1,572 | - | - |
$277
-
MMBtu
|
- | $170 | |
10 | 2.1233: Analyze flue gas for proper air/fuel ratio | $246 | $878 | - | - |
$146
-
MMBtu
|
- | $100 | |
TOTAL RECOMMENDED | $44,237 | $67,819 |
$32,597
502,266
kWh
|
$6,890
-
kW-mo/yr
|
$5,147
-
MMBtu
|
$(-667.0) | $270 | ||
TOTAL IMPLEMENTED | $4,877 | $6,773 |
$3,975
61,248
kWh
|
$876
-
kW-mo/yr
|
$423
-
MMBtu
|
$(-667.0) | $270 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs