ITAC Assessment: CO0113
ITAC logo
ITAC Assessment: CO0113
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product AGITATION EQUIPMENT
NAICS
n/a
SIC 3531: Construction Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 4,500,000
lb
Production Hrs. Annual 0
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $302,720 4,846,424
kWh
Natural Gas $125,088 30,851
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,882 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,456

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $3,170 $9,000 $(-106.0)
(-1,758)
kWh
$3,276
-
MMBtu
02 2.7261: Install timers and/or thermostats $3,210 $3,000 - $3,210
-
MMBtu
03 2.7446: Utilize sensors controlling roof and wall openings $4,225 $4,500 - $4,225
-
MMBtu
04 2.7447: Install vinyl strip / high speed / air curtain doors $311 $600 - $311
-
MMBtu
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $302 - $302
4,982
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,920 $1,000 $1,920
30,774
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,744 $2,478 $1,744
27,843
kWh
-
TOTAL RECOMMENDED $14,882 $20,578 $3,860
61,841
kWh
$11,022
-
MMBtu
TOTAL IMPLEMENTED $6,456 $6,100 $1,920
30,774
kWh
$4,536
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs