Assessment Year | 1991 |
---|---|
Principal Product | BLANKETS, BEDSPREADS |
NAICS |
n/a
|
SIC | 2392: House furnishing, Except Curtains and Draperies |
Sales Range | $50 M to 100M |
# of Employees | 650 |
Plant Area |
n/a
|
Annual Production | 12,120,000
pieces
|
Production Hrs. Annual | 8,232
hrs
|
Location (State) | South Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,029,949 | 22,050,118 |
kWh
|
$0.047 |
Natural Gas | $225,315 | 49,675 |
MMBtu
|
$4.54 |
Coal | $200,751 | 143,220 |
MMBtu
|
$1.40 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $56,284 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Coal Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2136: Install / repair insulation on steam lines | $5,308 | $2,090 | - |
$5,308
-
MMBtu
|
- | |
02 | 2.2135: Repair and eliminate steam leaks | $1,631 | $770 | - |
$1,631
-
MMBtu
|
- | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $13,017 | - |
$13,017
276,964
kWh
|
- | - | |
04 | 2.2511: Insulate bare equipment | $1,295 | $2,396 | - |
$1,295
-
MMBtu
|
- | |
05 | 2.2135: Repair and eliminate steam leaks | $1,013 | $100 | - |
$1,013
-
MMBtu
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $5,813 | $1,440 |
$5,813
123,681
kWh
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,746 | - |
$8,430
179,367
kWh
|
- | $(-1,684.0) | |
08 | 2.6232: Install set-back timers | $1,708 | - |
$1,708
36,342
kWh
|
- | - | |
09 | 2.3191: Use demand controller or load shedder | $19,753 | $20,800 |
$19,753
-
kWh
|
- | - | |
TOTAL RECOMMENDED | $56,284 | $27,596 |
$48,721
616,354
kWh
|
$9,247
-
MMBtu
|
$(-1,684.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Coal Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs