ITAC Assessment: NC0406
ITAC logo
ITAC Assessment: NC0406
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Polymers and resins
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $50
M
to 100
M
# of Employees 96
Plant Area 220,000
ft2
Annual Production 106,000,000
lb
Production Hrs. Annual 7,080
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $298,364 8,932,572
kWh
Electricity Demand $166,310 17,235
kW-mo/yr
Electricity Fees $2,071 -
Natural Gas $412,630 70,242
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $472,761 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $329,234

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 4.212: Adopt in-house material generation $77,083 $85,000 $(-18,474.0)
(-535,055)
kWh
$(-9,203.0)
-
kW-mo/yr
- - $(-2,400.0) $107,160 -
02 3.4113: Treat and reuse rinse waters $51,487 $8,875 $(-264.0)
(-7,923)
kWh
$(-132.0)
-
kW-mo/yr
- - - - $51,883
-
Tgal
03 2.4231: Reduce the pressure of compressed air to the minimum required $11,177 $50 $7,871
235,663
kWh
$3,306
-
kW-mo/yr
- - - - -
04 2.4131: Size electric motors for peak operating efficiency $16,743 $50,000 $16,743
501,300
kWh
- - - - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,835 $100 $1,953
58,466
kWh
$722
-
kW-mo/yr
- $(-600.0) - $(-240.0) -
06 2.2437: Recover waste heat from equipment $10,210 $15,045 $(-206.0)
(-6,162)
kWh
$(-102.0)
-
kW-mo/yr
$10,518
-
MMBtu
- - - -
07 2.1243: Use heat from boiler blowdown to preheat boiler feed water $4,747 $8,000 - - $4,747
-
MMBtu
- - - -
08 2.7224: Reduce space conditioning during non-working hours $508 $920 $508
15,200
kWh
- - - - - -
09 2.7135: Install occupancy sensors $1,958 $3,256 $1,958
58,629
kWh
- - - - - -
10 4.111: Add equipment/ operators to reduce production bottleneck $276,388 $214,700 - - $(-812.0)
-
MMBtu
$277,200 - - -
11 4.111: Add equipment/ operators to reduce production bottleneck $20,625 $50,000 - - - $20,625 - - -
TOTAL RECOMMENDED $472,761 $435,946 $10,089
320,118
kWh
$(-5,409.0)
-
kW-mo/yr
$14,453
-
MMBtu
$297,225 $(-2,400.0) $106,920 $51,883
-
Tgal
TOTAL IMPLEMENTED $329,234 $319,026 $29,033
869,258
kWh
$4,028
-
kW-mo/yr
$(-812.0)
-
MMBtu
$297,225 - $(-240.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs