Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product SAFETY HARDWARE, FORGING
NAICS
n/a
SIC 3429: Hardware, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,600
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $122,899 2,053,927
kWh
Natural Gas $105,063 35,725
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,394 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,411

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $320 $213 $320
6,155
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $409 - $509
20,223
kWh
- $(-100.0)
03 2.4231: Reduce the pressure of compressed air to the minimum required $682 - $682
27,257
kWh
- -
04 2.3212: Optimize plant power factor $2,706 $7,500 $2,706
-
kWh
- -
05 2.2414: Use waste heat from hot flue gases to preheat $12,277 $22,000 - $12,277
-
MMBtu
-
TOTAL RECOMMENDED $16,394 $29,713 $4,217
53,635
kWh
$12,277
-
MMBtu
$(-100.0)
TOTAL IMPLEMENTED $1,411 $213 $1,511
53,635
kWh
- $(-100.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs