83,571
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| SU0600 #11 Y:2026 | 11 | 2026 | Convert to indirect temperature control system | $6,495 | $52,500 | |
| SU0600 #10 Y:2026 | 10 | 2026 | Install occupancy sensors | $498 | $1,557 | |
| SU0600 #08 Y:2026 | 08 | 2026 | Conserve energy by efficient use of vending machines | $379 | $741 | |
| SU0600 #05 Y:2026 | 05 | 2026 | Install spectral reflectors / delamp | $4,114 | $480 | |
| SU0600 #03 Y:2026 | 03 | 2026 | Reduce the pressure of compressed air to the minimum required | $5,515 | - | |
| SU0599 #11 Y:2026 | 11 | 2026 | Use solar heat to make electricty | $247,587 | $4,721,768 | |
| SU0599 #02 Y:2026 | 02 | 2026 | Eliminate/reduce an operation | $39,205 | - | |
| MS0471 #04 Y:2026 | 04 | 2026 | Air condition only space necessary | $1,695 | $4,662 | |
| MS0471 #03 Y:2026 | 03 | 2026 | Use solar heat to make electricty | $309,363 | $4,228,200 | |
| MS0471 #02 Y:2026 | 02 | 2026 | Eliminate or reduce compressed air usage | $182 | - | |
| MS0471 #01 Y:2026 | 01 | 2026 | Install occupancy sensors | $22,607 | $12,329 | |
| UD1131 #05 Y:2026 | 05 | 2026 | Reduce the pressure of compressed air to the minimum required | $902 | $4,296 | |
| UD1131 #04 Y:2026 | 04 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,166 | $953 | |
| UD1131 #03 Y:2026 | 03 | 2026 | Preheat combustion air with waste heat | $16,940 | $25,320 | |
| WM0260 #05 Y:2026 | 05 | 2026 | Repair and eliminate steam leaks | $128 | $377 | |
| WM0260 #04 Y:2026 | 04 | 2026 | Install occupancy sensors | $1,611 | $300 | |
| WM0260 #03 Y:2026 | 03 | 2026 | Lower temperature during the winter season and vice-versa | $1,623 | - | |
| WM0260 #02 Y:2026 | 02 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $9,830 | $6,760 | |
| WM0260 #01 Y:2026 | 01 | 2026 | Reschedule plant operations or reduce load to avoid peaks | $20,053 | - | |
| WM0259 #05 Y:2026 | 05 | 2026 | Install spectral reflectors / delamp | $265 | - |