ITAC Assessment: WM0236
ITAC logo
ITAC Assessment: WM0236
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product PEX-A pipe
NAICS 326122: Plastics Pipe and Pipe Fitting Manufacturing
SIC 3084: Plastics Pipe
Sales Range greater than $500
M
# of Employees 549
Plant Area 393,030
ft2
Annual Production 15,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,440,682 38,148,065
kWh
Electricity Demand $969,700 76,218
kW-mo/yr
Electricity Fees $1,616,200 -
Natural Gas $98,530 12,293
MMBtu
Waste Disposal Costs
Water Usage $50,410 8,251
Tgal
Water Disposal $50,410 8,251
Tgal
TOTAL YEARLY COSTS $4,225,932
RECOMMENDED SAVINGS* $34,303 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.2612: Use cooling tower water instead of refrigeration $16,468 $142,500 $10,991
289,251
kWh
$5,477
-
kW-mo/yr
02 2.4231: Reduce the pressure of compressed air to the minimum required $15,581 - $10,682
281,102
kWh
$4,899
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,254 $1,975 $1,589
41,813
kWh
$665
-
kW-mo/yr
TOTAL RECOMMENDED $34,303 $144,475 $23,262
612,166
kWh
$11,041
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs