Assessment Year | 2025 |
---|---|
Principal Product | PEX-A pipe |
NAICS | 326122: Plastics Pipe and Pipe Fitting Manufacturing |
SIC | 3084: Plastics Pipe |
Sales Range | greater than $500 M |
# of Employees | 549 |
Plant Area |
393,030
ft2
|
Annual Production | 15,000
ton
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $1,440,682 | 38,148,065 |
kWh
|
$0.038 | |
Electricity Demand | $969,700 | 76,218 |
kW-mo/yr
|
$12.72 | |
Electricity Fees | $1,616,200 | - |
|
- | |
Natural Gas | $98,530 | 12,293 |
MMBtu
|
$8.02 | |
Waste Disposal Costs | |||||
Water Usage | $50,410 | 8,251 |
Tgal
|
$6.11 | |
Water Disposal | $50,410 | 8,251 |
Tgal
|
$6.11 | |
TOTAL YEARLY COSTS | $4,225,932 | ||||
RECOMMENDED SAVINGS* | $34,303 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.2612: Use cooling tower water instead of refrigeration | $16,468 | $142,500 |
$10,991
289,251
kWh
|
$5,477
-
kW-mo/yr
|
|
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $15,581 | - |
$10,682
281,102
kWh
|
$4,899
-
kW-mo/yr
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,254 | $1,975 |
$1,589
41,813
kWh
|
$665
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $34,303 | $144,475 |
$23,262
612,166
kWh
|
$11,041
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs