ITAC Assessment: DL0200
ITAC logo
ITAC Assessment: DL0200
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Bathroom Furnishing
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area 75,000
ft2
Annual Production 10,000,000
units
Production Hrs. Annual 6,450
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $622,794 10,944,000
kWh
Electricity Demand $484,472 26,546
kW-mo/yr
Electricity Fees $1,800 -
Natural Gas $121,869 11,353
MMBtu
TOTAL YEARLY COSTS $1,230,935
RECOMMENDED SAVINGS* $158,544 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,172

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6231: Utilize controls to operate equipment only when needed $16,029 - $16,029
158,701
kWh
-
02 2.6231: Utilize controls to operate equipment only when needed $4,955 - $4,955
49,057
kWh
-
03 2.6231: Utilize controls to operate equipment only when needed $1,899 $200 $840
8,312
kWh
$1,059
-
MMBtu
04 2.6218: Turn off equipment when not in use $1,182 - $477
4,720
kWh
$705
-
MMBtu
05 2.4322: Use or replace with energy efficient substitutes $9,055 $3,275 $9,055
89,655
kWh
-
06 2.4226: Use / purchase optimum sized compressor $30,035 $121,361 $30,035
297,379
kWh
-
07 2.6231: Utilize controls to operate equipment only when needed $16,430 $36,000 $16,430
162,669
kWh
-
08 2.6231: Utilize controls to operate equipment only when needed $75,171 $186,000 $75,171
744,267
kWh
-
09 2.7234: Use heat pump for space conditioning $3,788 $5,060 $3,788
37,500
kWh
-
TOTAL RECOMMENDED $158,544 $351,896 $156,780
1,552,260
kWh
$1,764
-
MMBtu
TOTAL IMPLEMENTED $36,172 $121,361 $35,467
351,156
kWh
$705
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs