ITAC Assessment: WM0234
ITAC logo
ITAC Assessment: WM0234
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Cheese
NAICS 311513: Cheese Manufacturing
SIC 2022: Natural, Processed, and Imitation Cheese
Sales Range $50
M
to 100
M
# of Employees 290
Plant Area 110,000
ft2
Annual Production 1
units
Production Hrs. Annual 6,006
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,292,479 10,904,750
kWh
Electricity Demand $420,613 22,968
kW-mo/yr
Natural Gas $140,086 28,486
MMBtu
Waste Disposal Costs
Water Usage $20,000 2,500
Tgal
TOTAL YEARLY COSTS $1,873,178
RECOMMENDED SAVINGS* $60,549 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $41,369 $5,616 $28,971
419,873
kWh
$12,398
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,917 $2,750 $4,342
62,928
kWh
$1,575
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $5,032 $279 $3,567
51,689
kWh
$1,465
-
kW-mo/yr
-
04 2.4221: Install compressor air intakes in coolest locations $3,592 $10,895 $2,493
34,831
kWh
$1,099
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $3,221 - $2,360
34,200
kWh
$861
-
kW-mo/yr
-
06 2.7221: Lower temperature during the winter season and vice-versa $1,418 - $945
13,700
kWh
$355
-
kW-mo/yr
$118
-
MMBtu
TOTAL RECOMMENDED $60,549 $19,540 $42,678
617,221
kWh
$17,753
-
kW-mo/yr
$118
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs