ITAC Assessment: IA0113
ITAC logo
ITAC Assessment: IA0113
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product lead acid batteries
NAICS
n/a
SIC 3692: Primary Batteries, Dry and Wet
Sales Range $10
M
to 50
M
# of Employees 89
Plant Area 67,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 5,880
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $198,651 6,100,235
kWh
Natural Gas $26,308 5,437
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,743 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,857

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,141 $1,000 $2,141
65,944
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,014 $684 $1,014
31,067
kWh
- -
03 2.4237: Substitute compressed air cooling with water or air cooling $111 $193 $111
3,517
kWh
- -
04 2.7124: Make a practice of turning off lights when not needed $1,348 - $1,348
41,325
kWh
- -
05 2.7135: Install occupancy sensors $806 $1,370 $806
24,912
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,078 $13,034 $3,078
94,666
kWh
- -
07 3.1191: Change procedures / equipment / operating conditions $8,243 $75 - - $8,243
-
lb
08 3.6112: Use filter and drying oven to reduce sludge volume $3,818 $5,467 - - $3,818
-
lb
09 3.6193: Install equipment (eg compactor) to reduce disposal costs $2,184 $3,600 - $2,184
-
lb
-
TOTAL RECOMMENDED $22,743 $25,423 $8,498
261,431
kWh
$2,184
-
lb
$12,061
-
lb
TOTAL IMPLEMENTED $10,857 $21,555 $7,039
216,589
kWh
- $3,818
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs