ITAC Assessment: KU0289
ITAC logo
ITAC Assessment: KU0289
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product PRINTED COMPUTER FORMS
NAICS
n/a
SIC 2761: Manifold Business Forms
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area
n/a
Annual Production 389,000
pieces
Production Hrs. Annual 6,048
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $225,460 4,056,858
kWh
Natural Gas $18,922 6,149
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,319 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,837

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $1,155 $1,600 - $1,155
-
MMBtu
02 2.4133: Use most efficient type of electric motors $3,454 $2,880 $3,454
62,134
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,861 $8,150 $3,861
69,461
kWh
-
04 2.2191: Substitute hot process fluids for steam $6,782 $7,500 $2,655
47,773
kWh
$4,127
-
MMBtu
05 2.7263: Lower compressor pressure through a/c system modification $5,839 $12,000 $5,839
104,924
kWh
-
06 2.6232: Install set-back timers $228 $40 $228
4,103
kWh
-
TOTAL RECOMMENDED $21,319 $32,170 $16,037
288,395
kWh
$5,282
-
MMBtu
TOTAL IMPLEMENTED $4,837 $4,520 $3,682
66,237
kWh
$1,155
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs