ITAC Assessment: ME0127
ITAC logo
ITAC Assessment: ME0127
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Wool Textiles
NAICS
n/a
SIC 2231: Broadwoven Fabric Mills, Wool (Including Dyeing and Finishing)
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 100,000
ft2
Annual Production 7,800,000
lb
Production Hrs. Annual 4,000
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $164,222 1,342,907
kWh
Fuel Oil #6 $30,139 13,050
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,889 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,999

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Fuel Oil #6 Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $4,325 $3,090 $4,730
38,687
kWh
$(-405.0)
-
MMBtu
-
02 2.2514: Cover open tanks $4,708 $1,600 - - $4,708
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $328 $100 $328
2,638
kWh
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $1,963 $400 - - $1,963
-
MMBtu
05 2.4323: Use optimum size and capacity equipment $565 $225 $565
4,689
kWh
- -
TOTAL RECOMMENDED $11,889 $5,415 $5,623
46,014
kWh
$(-405.0)
-
MMBtu
$6,671
-
MMBtu
TOTAL IMPLEMENTED $6,999 $2,100 $328
2,638
kWh
- $6,671
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs