ITAC Assessment: CO0551
ITAC logo
ITAC Assessment: CO0551
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Aircraft fuselage
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 300
Plant Area 52,000
ft2
Annual Production 6
pieces
Production Hrs. Annual 2,808
hrs
Location (State) New Mexico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $96,901 1,387,800
kWh
Electricity Demand $9,785 2,868
kW-mo/yr
Electricity Fees $2,062 -
Natural Gas $5,182 667
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,620 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,140

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.2437: Recover waste heat from equipment $1,340 $4,280 - - $1,340
-
MMBtu
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,230 $60 $1,020
12,500
kWh
$210
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $910 $320 $750
9,200
kWh
$160
-
kW-mo/yr
- -
04 2.4323: Use optimum size and capacity equipment $190 $750 $170
2,400
kWh
$20
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $11,300 $13,550 $9,310
118,200
kWh
$1,420
-
kW-mo/yr
- $570
06 2.7135: Install occupancy sensors $510 $300 $510
5,700
kWh
- - -
07 2.7135: Install occupancy sensors $140 $390 $140
2,700
kWh
- - -
TOTAL RECOMMENDED $15,620 $19,650 $11,900
150,700
kWh
$1,810
-
kW-mo/yr
$1,340
-
MMBtu
$570
TOTAL IMPLEMENTED $2,140 $380 $1,770
21,700
kWh
$370
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs