Assessment Year | 2024 |
---|---|
Principal Product | aluminum casting |
NAICS | 331524: Aluminum Foundries (except Die-Casting) |
SIC | 3365: Aluminum Foundries |
Sales Range | $50 M to 100M |
# of Employees | 500 |
Plant Area |
244,373
ft2
|
Annual Production | 32,520,222
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $863,666 | 11,468,950 |
kWh
|
$0.075 | |
Electricity Demand | $324,658 | 25,262 |
kW-mo/yr
|
$12.85 | |
Electricity Fees | $95,820 | - |
|
- | |
Natural Gas | $1,337,854 | 189,402 |
MMBtu
|
$7.06 | |
Waste Disposal Costs | |||||
Water Usage | $115,257 | 11,266 |
Tgal
|
$10.23 | |
TOTAL YEARLY COSTS | $2,737,255 | ||||
RECOMMENDED SAVINGS* | $186,297 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $134,386 | $400,000 | - | - |
$134,386
-
MMBtu
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $29,665 | $2,875 |
$24,025
320,338
kWh
|
$5,640
-
kW-mo/yr
|
- | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $11,427 | - |
$9,255
123,395
kWh
|
$2,172
-
kW-mo/yr
|
- | |
04 | 2.6218: Turn off equipment when not in use | $7,912 | - | - | - |
$7,912
-
MMBtu
|
|
05 | 2.7135: Install occupancy sensors | $2,908 | $2,206 |
$2,319
30,910
kWh
|
$589
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $186,297 | $405,081 |
$35,599
474,643
kWh
|
$8,400
-
kW-mo/yr
|
$142,298
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs