ITAC Assessment: WM0165
ITAC logo
ITAC Assessment: WM0165
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Asphalt Plants
NAICS 333120: Construction Machinery Manufacturing
SIC 3531: Construction Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 62,000
ft2
Annual Production 10,000
pieces
Production Hrs. Annual 3,500
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $91,191 1,475,400
kWh
Electricity Demand $107,603 8,138
kW-mo/yr
Electricity Fees $20,479 -
Natural Gas $113,507 24,326
MMBtu
Waste Disposal Costs
Water Usage $3,548 101,538
Tgal
TOTAL YEARLY COSTS $336,328
RECOMMENDED SAVINGS* $43,167 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $23,243 $76,150 - - $23,243
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,709 $7,202 $3,014
48,615
kWh
$1,695
-
kW-mo/yr
-
03 2.7224: Reduce space conditioning during non-working hours $3,846 - $3,846
62,032
kWh
- -
04 2.7232: Replace existing hvac unit with high efficiency model $2,552 $6,405 - - $2,552
-
MMBtu
05 2.7135: Install occupancy sensors $2,370 $1,800 $1,518
24,479
kWh
$852
-
kW-mo/yr
-
06 2.2437: Recover waste heat from equipment $2,324 $4,100 $1,012
16,314
kWh
- $1,312
-
MMBtu
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,598 $3,500 $1,009
16,275
kWh
$589
-
kW-mo/yr
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $1,497 - $1,057
17,059
kWh
$440
-
kW-mo/yr
-
09 2.4221: Install compressor air intakes in coolest locations $1,028 $2,237 $649
10,469
kWh
$379
-
kW-mo/yr
-
TOTAL RECOMMENDED $43,167 $101,394 $12,105
195,243
kWh
$3,954
-
kW-mo/yr
$27,107
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs