| Assessment Year | 2021 |
|---|---|
| Principal Product | Asphalt Plants |
| NAICS | 333120: Construction Machinery Manufacturing |
| SIC | 3531: Construction Machinery and Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 85 |
| Plant Area |
62,000
ft2
|
| Annual Production | 10,000
pieces
|
| Production Hrs. Annual | 3,500
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $91,191 | 1,475,400 |
kWh
|
$0.062 | |
| Electricity Demand | $107,603 | 8,138 |
kW-mo/yr
|
$13.22 | |
| Electricity Fees | $20,479 | - |
|
- | |
| Natural Gas | $113,507 | 24,326 |
MMBtu
|
$4.67 | |
| Waste Disposal Costs | |||||
| Water Usage | $3,548 | 101,538 |
Tgal
|
$0.035 | |
| TOTAL YEARLY COSTS | $336,328 | ||||
| RECOMMENDED SAVINGS* | $43,167 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7447: Install vinyl strip / high speed / air curtain doors | $23,243 | $76,150 | - | - |
$23,243
-
MMBtu
|
|
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,709 | $7,202 |
$3,014
48,615
kWh
|
$1,695
-
kW-mo/yr
|
- | |
| 03 | 2.7224: Reduce space conditioning during non-working hours | $3,846 | - |
$3,846
62,032
kWh
|
- | - | |
| 04 | 2.7232: Replace existing hvac unit with high efficiency model | $2,552 | $6,405 | - | - |
$2,552
-
MMBtu
|
|
| 05 | 2.7135: Install occupancy sensors | $2,370 | $1,800 |
$1,518
24,479
kWh
|
$852
-
kW-mo/yr
|
- | |
| 06 | 2.2437: Recover waste heat from equipment | $2,324 | $4,100 |
$1,012
16,314
kWh
|
- |
$1,312
-
MMBtu
|
|
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,598 | $3,500 |
$1,009
16,275
kWh
|
$589
-
kW-mo/yr
|
- | |
| 08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,497 | - |
$1,057
17,059
kWh
|
$440
-
kW-mo/yr
|
- | |
| 09 | 2.4221: Install compressor air intakes in coolest locations | $1,028 | $2,237 |
$649
10,469
kWh
|
$379
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $43,167 | $101,394 |
$12,105
195,243
kWh
|
$3,954
-
kW-mo/yr
|
$27,107
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs