Assessment Year | 2025 |
---|---|
Principal Product | Masonry |
NAICS | 327331: Concrete Block and Brick Manufacturing |
SIC | 3251: Brick and Structural Clay Tile |
Sales Range | $10 M to 50M |
# of Employees | 53 |
Plant Area |
100,000
ft2
|
Annual Production | 40,000
ton
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $167,633 | 3,257,534 |
kWh
|
$0.051 |
Electricity Demand | $198,481 | 12,020 |
kW-mo/yr
|
$16.51 |
Electricity Fees | $8,828 | - |
|
- |
Natural Gas | $831,065 | 305,539 |
MMBtu
|
$2.72 |
TOTAL YEARLY COSTS | $1,206,007 | |||
RECOMMENDED SAVINGS* | $82,153 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $64,709 | $86,472 | - | - |
$64,709
-
MMBtu
|
- | - | |
02 | 2.4157: Establish a predictive maintenance program | $4,780 | $5,200 |
$5,484
106,494
kWh
|
$4,689
-
kW-mo/yr
|
- | $(-5,393.0) | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,750 | $6,504 |
$2,802
54,415
kWh
|
$1,948
-
kW-mo/yr
|
- | - | - | |
04 | 2.4151: Develop a repair/replace policy | $3,482 | $1,197 |
$1,234
23,961
kWh
|
$2,278
-
kW-mo/yr
|
- | - | $(-30.0) | |
05 | 2.7135: Install occupancy sensors | $2,075 | $3,893 |
$999
19,409
kWh
|
$1,076
-
kW-mo/yr
|
- | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,979 | $653 |
$691
13,424
kWh
|
$1,288
-
kW-mo/yr
|
- | - | - | |
07 | 2.4224: Upgrade controls on compressors | $329 | $1,415 |
$131
2,547
kWh
|
$198
-
kW-mo/yr
|
- | - | - | |
08 | 2.4239: Eliminate or reduce compressed air usage | $49 | $140 |
$16
304
kWh
|
$33
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $82,153 | $105,474 |
$11,357
220,554
kWh
|
$11,510
-
kW-mo/yr
|
$64,709
-
MMBtu
|
$(-5,393.0) | $(-30.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs