ITAC Assessment: WV0676
ITAC logo
ITAC Assessment: WV0676
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Masonry
NAICS 327331: Concrete Block and Brick Manufacturing
SIC 3251: Brick and Structural Clay Tile
Sales Range $10
M
to 50
M
# of Employees 53
Plant Area 100,000
ft2
Annual Production 40,000
ton
Production Hrs. Annual 8,736
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $167,633 3,257,534
kWh
Electricity Demand $198,481 12,020
kW-mo/yr
Electricity Fees $8,828 -
Natural Gas $831,065 305,539
MMBtu
TOTAL YEARLY COSTS $1,206,007
RECOMMENDED SAVINGS* $82,153 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2511: Insulate bare equipment $64,709 $86,472 - - $64,709
-
MMBtu
- -
02 2.4157: Establish a predictive maintenance program $4,780 $5,200 $5,484
106,494
kWh
$4,689
-
kW-mo/yr
- $(-5,393.0) -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,750 $6,504 $2,802
54,415
kWh
$1,948
-
kW-mo/yr
- - -
04 2.4151: Develop a repair/replace policy $3,482 $1,197 $1,234
23,961
kWh
$2,278
-
kW-mo/yr
- - $(-30.0)
05 2.7135: Install occupancy sensors $2,075 $3,893 $999
19,409
kWh
$1,076
-
kW-mo/yr
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,979 $653 $691
13,424
kWh
$1,288
-
kW-mo/yr
- - -
07 2.4224: Upgrade controls on compressors $329 $1,415 $131
2,547
kWh
$198
-
kW-mo/yr
- - -
08 2.4239: Eliminate or reduce compressed air usage $49 $140 $16
304
kWh
$33
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $82,153 $105,474 $11,357
220,554
kWh
$11,510
-
kW-mo/yr
$64,709
-
MMBtu
$(-5,393.0) $(-30.0)
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs