ITAC Assessment: WI0499
ITAC logo
ITAC Assessment: WI0499
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Fabrication
NAICS 331210: Iron and Steel Pipe and Tube Manufacturing from Purchased Steel
SIC 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills
Sales Range $50
M
to 100
M
# of Employees 70
Plant Area 60,000
ft2
Annual Production 2,500,000
lb
Production Hrs. Annual 2,100
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $28,831 721,572
kWh
Electricity Demand $25,098 2,892
kW-mo/yr
Electricity Fees $12,122 -
Natural Gas $62,682 6,502
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $73,113 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $63,713

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Gas Savings Personnel Changes Savings Administrative Changes Savings
01 4.426: Modify workload $42,000 $3,600 - - - - $42,000 -
02 2.7261: Install timers and/or thermostats $9,925 $600 - - $9,925
-
MMBtu
- - -
03 3.6193: Install equipment (eg compactor) to reduce disposal costs $9,400 - - - - - - $9,400
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,192 $22,500 $2,765
65,841
kWh
$3,427
-
kW-mo/yr
- - - -
05 2.4322: Use or replace with energy efficient substitutes $4,285 $300 - - - $85
-
MMBtu
$4,200 -
06 2.4221: Install compressor air intakes in coolest locations $967 $1,280 $348
8,272
kWh
$619
-
kW-mo/yr
- - - -
07 2.7144: Install spectral reflectors / delamp $344 - $153
3,654
kWh
$191
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $73,113 $28,280 $3,266
77,767
kWh
$4,237
-
kW-mo/yr
$9,925
-
MMBtu
$85
-
MMBtu
$46,200 $9,400
TOTAL IMPLEMENTED $63,713 $28,280 $3,266
77,767
kWh
$4,237
-
kW-mo/yr
$9,925
-
MMBtu
$85
-
MMBtu
$46,200 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs