ITAC Assessment: AM0442
ITAC logo
ITAC Assessment: AM0442
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Sealing components, gaskets
NAICS 339991: Gasket, Packing, and Sealing Device Manufacturing
SIC 3053: Gaskets, Packing, and Sealing Devices
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 210,000
ft2
Annual Production 3,600,000
lb
Production Hrs. Annual 7,344
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $484,746 11,244,018
kWh
Electricity Fees $240 -
Natural Gas $560,600 100,228
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $224,850 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $224,850

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.2113: Repair or replace steam traps $101,200 $4,800 - $101,200
-
MMBtu
- - -
02 2.2121: Increase amount of condensate returned $91,900 $16,800 - $40,200
-
MMBtu
- $11,900 $39,800
-
Tgal
03 2.1232: Keep boiler tubes clean $12,600 $500 - $12,600
-
MMBtu
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $4,700 $21 $4,700
91,700
kWh
- - - -
05 2.1232: Keep boiler tubes clean $4,500 $500 - $4,500
-
MMBtu
- - -
06 2.2135: Repair and eliminate steam leaks $3,600 $1,000 - $3,600
-
MMBtu
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,800 $500 $2,800
54,800
kWh
- - - -
08 2.2511: Insulate bare equipment $2,640 $650 - $2,640
-
MMBtu
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $710 $1,200 $190
3,680
kWh
- $380 $140 -
10 2.7121: Utilize daylight whenever possible in lieu of artificial light $200 $50 $200
4,000
kWh
- - - -
TOTAL RECOMMENDED $224,850 $26,021 $7,890
154,180
kWh
$164,740
-
MMBtu
$380 $12,040 $39,800
-
Tgal
TOTAL IMPLEMENTED $224,850 $26,021 $7,890
154,180
kWh
$164,740
-
MMBtu
$380 $12,040 $39,800
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs