| Assessment Year | 2019 |
|---|---|
| Principal Product | Wastewater Treatment |
| NAICS | 221320: Sewage Treatment Facilities |
| SIC | 4952: Sewerage Systems |
| Sales Range | $10 M to 50M |
| # of Employees | 15 |
| Plant Area |
110,000
ft2
|
| Annual Production | 3,526,000
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $243,225 | 5,402,600 |
kWh
|
$0.045 |
| Electricity Demand | $41,561 | 11,053 |
kW-mo/yr
|
$3.76 |
| Electricity Fees | $194,213 | - |
|
- |
| Natural Gas | $30,276 | 4,684 |
MMBtu
|
$6.46 |
| TOTAL YEARLY COSTS | $509,275 | |||
| RECOMMENDED SAVINGS* | $53,502 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $34,429 | - |
$34,429
764,747
kWh
|
- | |
| 02 | 2.4133: Use most efficient type of electric motors | $4,197 | - |
$3,766
83,647
kWh
|
$431
-
kW-mo/yr
|
|
| 03 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $2,185 | - |
$2,185
48,526
kWh
|
- | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $9,533 | - |
$7,758
172,324
kWh
|
$1,775
-
kW-mo/yr
|
|
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,158 | - |
$3,158
70,151
kWh
|
- | |
| TOTAL RECOMMENDED | $53,502 | - |
$51,296
1,139,395
kWh
|
$2,206
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs