ITAC Assessment: UD1004
ITAC logo
ITAC Assessment: UD1004
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Wastewater Treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 15
Plant Area 110,000
ft2
Annual Production 3,526,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $243,225 5,402,600
kWh
Electricity Demand $41,561 11,053
kW-mo/yr
Electricity Fees $194,213 -
Natural Gas $30,276 4,684
MMBtu
TOTAL YEARLY COSTS $509,275
RECOMMENDED SAVINGS* $53,502 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4133: Use most efficient type of electric motors $34,429 - $34,429
764,747
kWh
-
02 2.4133: Use most efficient type of electric motors $4,197 - $3,766
83,647
kWh
$431
-
kW-mo/yr
03 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $2,185 - $2,185
48,526
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $9,533 - $7,758
172,324
kWh
$1,775
-
kW-mo/yr
05 2.4231: Reduce the pressure of compressed air to the minimum required $3,158 - $3,158
70,151
kWh
-
TOTAL RECOMMENDED $53,502 - $51,296
1,139,395
kWh
$2,206
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs